Get in touch with Zeyu lntelligent Industrial Company
Twist Pin Line Throughput & Capacity Calculator
Project monthly finished-contact output of a ZEUEE 6-machine line. Bottleneck station is ZY04 cutting/welding (10–13 pcs/min).
11 pcs/min
22 days
85%
Projected Output
Monthly finished contacts—
Per shift-hour—
Daily output—
Annual capacity—
Assumes 8-hour shifts and ZY04 as the line bottleneck. Upstream stations (winding/braiding at 50 m/min, expansion at 15–17 pcs/min) hold headroom above this rate. Real ramp to target OEE typically takes one to two quarters.
Discuss Your Capacity Target with Our Engineers →