Get in touch with Zeyu lntelligent Industrial Company
Pin Insertion ROI Calculator
Estimate the payback period and 5-year savings of replacing manual or semi-automated pin insertion with a ZEUEE Twist Pin & Insulator Insertion Machine.
Your Current Process
Total contacts inserted across all assemblies per year
Average per-insertion time on your current process
Industry research shows 2-3% on manual press-fit; 0.15-0.5% on closed-loop automation
Headcount currently assigned to this station
Wage + benefits + payroll taxes + supervision (typically 30-60% above wage line)
Material + labor cost embedded in each scrapped contact
Estimated ROI Snapshot
Enter your numbers on the left and press Calculate Payback.
Note: This calculator uses published industry benchmarks (18-30 month typical payback, 25-45% annual savings, 35-60% throughput improvement) and the cost assumptions you supply. Actual results depend on your specific application, factory floor layout, and qualification requirements. ZEUEE will produce a written ROI letter based on your real inputs within five business days.




